>> الأحداث والأخبار >> اخبار الصناعة
What are the installation steps of the mobile hydraulic cloth machine?
When the mobile hydraulic fabric is transported to the construction site,there are two constructions,namely:mobile hydraulic fabric machine,and mass,then what are the installation steps?
1.First put the matching block frame filled with our concrete.
2.Check whether the hiking of the tower crane meets our requirements.
3,when the mobile fabric is placed in the designated position,it can put a piece of wooden board under its leg,increase the affected area ofthe leg,the load of the wooden board is not the iron block load,more than 20 meters or more hydraulic cloth machine,meditation The iron plate is suitable.
4.When the concrete delivery tube is arranged,consider the split(quick tube card)and fixed.
5.The staff will make a batch of overtakes at the height of the floor.
The cloth machine is forbidden to have a construction personnel below when working or moved,and must carefully read the safety manual of hydraulic fabrics.
Why is the hydraulic cloth jitter?
1.There are many factors of the hydraulic fabric machine:plugging,the cylinder lacks hydraulic oil,and the pumping system will occur when the pumping system will stop pumping in time.The lack of hydraulic oil jitter is because the hydraulic top cylinder needs to transfer the force to support the arm frame,and the power is lacking,the power is insufficient,resulting in jitter.